New Construction EPC project of 132kv single circuit overhead transmission line for ERBL photovoltaic power plant extension in Bangladesh
Completion date:July, 2021
The work sope is design, supply, erection, testing and commissioning of 132kV single circuit overhead interconnecting transmission line from ERBL 132kV Solar Power Plant Substation to existing 132kV Mongla Grid Substation with total line length of 8.9km with a contract value of USD 2.133 million, which has been completed and delivered in July 2021.
-
国家:孟加拉(Bangladesh)
-
电压等级(KV):230KV